Articles
20.04.2026
Russian megaprojects: The Great Siberian Road or the Trans-Siberian Railway
Evgeniy Pikulev, PMP, PME
01.04.2026
Megaproject of the Circum-Baikal Railway: Golden buckle of the Russian steel belt
Evgeniy Pikulev, PMP, PME
31.10.2025
Climate megaproject or the history of the Kama Hydroelectric Power Station
Evgeniy Pikulev, PMP, PME
15.05.2025
Megaprojects of the USSR: Brigade contracting at construction sites
Evgeniy Pikulev, PMP, PME
03.04.2025
Memories of the future. Implementation of megaprojects in the USSR. Part 2.
Igor Pletenny, project manager
27.03.2025
Memories of the future. Implementation of megaprojects in the USSR. Part 1
Igor Pletenny, project manager