127030, Moscow, 20 Novoslobodskaya St.

Evgeniy Pikulev

Director of PM Excellence Practice
PMP, PME
Evgeniy Pikulev

The art of project management: see the goal, believe in yourself, not notice obstacles.

The art of project management: see the goal, believe in yourself, not notice obstacles.
Work experience

For many years, as a member of the PM Excellence team, he participated in large-scale projects in various industries and regions of the country, gradually expanding his areas of competence. Worked in projects for companies:

  • Rusal PJSC Kuznetsov,
  • "MetProm"
  • I-Plast
  • etc.

Over 20 years of experience in project management in the following areas:

- Construction and renovation projects
- Projects in the field of improving business processes.
- IT projects
- Conducting trainings on project management, programs and project portfolios since 2014.

PROJECTS

2019 - present PM EXPERT
Conducting trainings in open and corporate formats, adapting training programs to the needs of the audience
Role: business coach/consultant

2018 - present JSC "Krasnodar International Airport"
• Project management for the reconstruction of the air checkpoint at Anapa International Airport
• Project management for the construction of the summer zone of the Anapa airport
• Project management for the improvement of the station area of the new terminal in Anapa
• Project management to improve the IT project management system.
• Project management to develop a development strategy for Anapa airport until 2020.
Role: Project Manager

2014 - 2017 Basel Aero LLC, management company of airports in the south
• Management of the project for the construction of a new airport "Anapa" airport with an area of 12 thousand sq.m. from the design stage to commissioning
• Work in the project team to draw up a design project and master planning for the new Krasnodar airport complex.
Role: Project Manager

2011 -2014 Flexible Technologies LLC
Management of the work of a consulting company in the field of management, reorganization of business processes, implementation of a project management system.
Role: General Director

2011 - 1995 CJSC "Inversion-Ural", OJSC "Sverdlovenergosbyt", Sverdlovsk Provincial Bank, OJSC "UBRiR", Ural Commercial Bank for Foreign Trade

Education

In 2000 graduated from the Russian Economic University named after G.V. Plekhanov, Moscow, specialty "Banking, Finance and Credit"

In 1993 Graduated from the Ural Federal University named after the first President of Russia B.N. Yeltsin, Yekaterinburg with a degree in Electrical Engineering, Automation of Industrial Plants


Articles
05.02.2026
Underground megaprojects

In Karl Capek's novel The War with the Newts (1936), man loses the battle for the subsoil. Salamanders take over entire continents, blockade cities through the underground infrastructure of their countless labyrinths and issue an ultimatum to people.

Evgeniy Pikulev, PMP, PME

21.01.2026
Megaprojects: Osudareva Road and White Sea-Baltic Canal

Evgeniy Pikulev, PMP, PME

12.01.2026
USSR megaprojects: Seven and a half "sisters"

Evgeniy Pikulev, PMP, PME

16.12.2025
USSR megaprojects: Kola superdeep SG-3

Evgeniy Pikulev, PMP, PME

25.11.2025
Megaprojects. Crimean bridge to the future

Evgeniy Pikulev, PMP, PME

31.10.2025
Climate megaproject or the history of the Kama Hydroelectric Power Station

This article continues a series of publications about megaprojects for the construction of power plants in the Soviet Union and Russia. Previously I wrote about the Zaramagskaya and Krasnoyarsk hydroelectric power stations. This story is about the Kamskaya hydroelectric power station, which certainly belongs to the megaprojects according to the PM Excellence classification, as it had an impact on more than 100 thousand people.

Evgeniy Pikulev, PMP, PME

10.10.2025
Megaproject: Evacuation and IL-2 production project

Evgeniy Pikulev, PMP, PME

04.09.2025
Megaprojects. Baikonur - construction site of the century

Evgeniy Pikulev, PMP, PME

15.08.2025
Megaprojects. The art of building bridges

Evgeniy Pikulev, PMP, PME

30.07.2025
Megaprojects: The Great Wall of China

Evgeniy Pikulev, PMP, PME

13.06.2025
Exhibition of megaprojects: From stability to aristocracy

Evgeniy Pikulev, PMP, PME

17.02.2025
Igor Kurchatov: Leader of the nuclear megaproject

Evgeniy Pikulev, PMP, PME

Megaprojects: Zaramagskaya HPP

Evgeniy Pikulev, PMP, PME

Megaprojects: Great and mighty

Evgeniy Pikulev, PMP, PME

News 1 - 20 of 27