GAZPROM INVEST LLC
PROJECT
"Northern European Gas Pipeline", "Ethane".
PM EXCELLENCE CONTRIBUTION
The PM Excellence team acted as an analytical center at the owner's Project Office, within which:
-
1. Developed detailed schedule network models of projects.
-
2. Established a procedure for interaction with contractors regarding the provision of data on the actual performance of work.
-
3. Developed a procedure for prioritizing work performed by contractors.
-
4. Organized work on the generation of regular and analytical reporting at the owner's requests.
REVIEW
"...During our work, the PM Excellence team accomplished:
• The process of providing initial data for updating the DRG and preparing project reports has been systematized.
• A practical approach to prioritizing the work of the project's CSG using the critical chain method is proposed.
• Proposals were generated to optimize analytical reporting for capital construction projects.
The above actions made it possible to identify strengths and weaknesses in approaches to project implementation, as well as set a further vector for the development of project approaches in the branch..."
Afanasyev A.N. Head of PDO, Gazprom Invest LLC