Sergey Shtanko
Director of PM Excellence practice
PME, MBA, NOSTROY
"Professional project management - when risks are calculated, the team is motivated, and the result is predictable."
"Professional project management - when risks are calculated, the team is motivated, and the result is predictable."
Work experience
He has more than 15 years of experience in the successful implementation of large capital projects and project portfolios in the oil and gas industry, energy, and metallurgy in such large Russian companies as Novatek, Rosneft, TNK-BP Management, etc.
Managed the following projects as a customer:
- 2024 - 2025 Castor Engineering LLC. Design and construction of generation facilities and mining centers with a total capacity of more than 40 MW.
- 2019 - 2023 DIAL ALLIANCE LLC. Design and construction of interfield gas pipeline, well development and expansion of gas treatment facility
- 2019 Baikal Mining Company LLC (now Udokan Copper LLC). Construction of a mining and metallurgical complex for the extraction and processing of copper ore.
- 2018 - 2019 NOVATEK-TARKOSALENEFTEGAZ LLC. Construction and launch into commercial operation of the North-Russkoye gas condensate field.
- 2017 - 2018 PJSC NK Rosneft, JSC Tyumenneftegaz. Management of a large capital project for the construction and launch of commercial operation of the Russian oil and gas field.
- 2015 - 2017 PJSC NK Rosneft, CJSC Vankorneft. Construction of facilities and launch of commercial operation of the Suzunskoye oil and gas field. Preparation and start of construction at the Tagulskoye and Lodochnoye fields.
- 2014 - 2015 PJSC NK Rosneft. Development and implementation of a Standard for the management of large-scale projects in the Exploration and Production (E&P) Block, replication to the subsidiaries of the E&D Block.
- 2011 - 2013 OJSC TNK-BP, OJSC Orenburgneft. Project management for the implementation of the Gas Program.
- 2008 - 2011 OJSC TNK-BP, OJSC TNK-Nyagan. Project management for the design and construction of a 72 MW gas turbine power plant